Build your system

Pick the size. See the price.

No packages, no bundles you don't need. Choose an inverter, choose a battery line, stack as many batteries as you want — the price updates as you go. Everything is Growatt, and every price includes the equipment, the installation.

1 Inverter capacity

Your main breaker sets the size. Multiply its amp rating by 120 for one leg, or by 240 for the whole house: a two-pole 30 A main is 3.6 kW per leg and 7.2 kW in total, so the 8 kW covers it. A 40 A main wants the 12 kW. The 3 kW is the entry system: it covers one 120 V leg on a 30 A service and no more. Always round up, never down.

Not sure? Send us a photo of your master breaker — here it's usually right under or beside the CFE meter at the service entrance, not inside the house. We'll read it in a minute; it's the easiest question we get all week.

2 How many inverters

3 Battery line
4 Battery modules
modules, stacked

Your order, before it goes to WhatsApp

Inverter
Batteries
Storage

DC breaker

InstallationIncluded

Installed+ tax

This opens WhatsApp with everything above pre-filled. Nothing is ordered or paid for yet — it just starts the conversation.

Prices are in Mexican pesos, installed — equipment, mounting, wiring and handover, plus tax and the fixed DC breaker fee below. Runtime figures assume a steady average draw and 90% usable capacity; your real numbers come from the load audit. Homes needing long cable runs, panel replacement or three-phase service are quoted separately, and we tell you that on the site visit rather than in the invoice.

Free site visit

Find out what your house actually needs.

Send a WhatsApp with your town and roughly what you'd like to keep running. We'll tell you what it takes and what it costs — and if a smaller system is the right answer, we'll tell you that too.